March 2026 Volume 22

Classroom Bridge connects Classrooms to Computer Labs

Staff reporter KC Times
Text Size
  • -
  • +
  • reset

The bridge connecting the 6th Form Block to the second-floor computer labs in the Douglas Forrest Building has been completed.

This bridge marks the final major construction milestone of the KC Library & Technology Capital Campaign.

The Douglas Forrest Building is now 98% complete and has been fully operational for the past two years, with students actively using the expanded library and computer labs every day.

Because of our donors' support, the building now features:

  • An expanded library
  • Modern computer labs
  • Administrative and staff spaces
  • The school's first-ever elevator
  • And now, a permanent bridge connecting students directly to technology

With construction effectively complete, we're now working on the Donor Wall—Kingston College's lasting way of saying thank you to those who made this vision a reality.
Every student who crosses this bridge is walking across generosity in action.

Top of Page

KCOBA Fortis Walkway Legacy Brick Order

Pay with PayPal button